Case Study: Aluminium Sunshade Installation

Successfully completing a high-risk project that multiple companies rejected - Dubai Substation Protection

Project Overview

A high-voltage substation in Dubai required a durable aluminium sheet sunshade cover to protect its sensitive equipment from extreme heat and direct sunlight. The project posed significant technical challenges, leading several companies to reject the job.

Despite the complexity, Peacestar Engineering Workshop accepted the challenge and successfully executed the project, showcasing our engineering expertise, problem-solving skills, and commitment to innovation.

Project Highlights

  • ✓ High-voltage substation protection
  • ✓ Custom aluminium sunshade design
  • ✓ Extreme safety requirements
  • ✓ Project rejected by multiple competitors

Project Gallery

Peace Star Engineering Workshop Case Study 1
Peace Star Engineering Workshop Case Study 1
Peace Star Engineering Workshop Case Study 1
Peace Star Engineering Workshop Case Study 1
Peace Star Engineering Workshop Case Study 1
Peace Star Engineering Workshop Case Study 1

Challenges

Structural Complexity

The substation's design made it difficult to cover with aluminium sheets.

Safety Concerns

Working around electrical infrastructure required strict compliance with safety protocols.

Environmental Factors

Dubai's high temperatures demanded materials that could withstand heat while remaining lightweight and corrosion-resistant.

Rejection by Other Companies

Multiple firms had already turned down the project due to its risk and difficulty.

Our Approach

1. Feasibility Assessment

Conducted detailed site inspections to evaluate structural requirements and material options.

2. Custom Design

Engineered a tailored aluminium sunshade design that could be securely installed without affecting the substation's functionality.

3. Skilled Fabrication

Manufactured high-quality aluminium sheets at our workshop to ensure durability and precision.

4. Safe Installation

Implemented strict safety measures while installing the sunshade around sensitive electrical components.

5. On-Time Delivery

Completed the project within the committed timeframe, minimizing disruption to the substation's operations.

Results

Successful Installation

Successful Installation of the aluminium sunshade cover, ensuring long-term protection for the substation.

Enhanced Durability

Enhanced Durability of equipment by reducing direct exposure to sunlight.

Recognition of Expertise

Peacestar Engineering Workshop was able to accomplish what several competitors had refused.

Client Satisfaction

The client appreciated our courage, technical skill, and dedication to delivering results.

Key Takeaway

This project highlights Peacestar Engineering Workshop's ability to take on high-risk, complex jobs where others step back. Our expertise in custom fabrication, innovative engineering solutions, and commitment to quality sets us apart as a trusted partner for challenging industrial projects in the UAE.

Ready for Your Next Challenge?

Have a complex project that others won't take on? Contact PeaceStar Engineering Workshop today.

Telephone: +971 4 333 6940

Email: peacestar1998@yahoo.com

69 25b street, Ras al Khor Industrial Area-2, Al Aweer, Dubai, United Arab Emirates.

PO Box: 60994, Makani No. 34549 85081

GET
QUOTE